[email protected]

6 Types of System scaffolding and Their Uses TotalContec

Sep 11, 2018 · Typically, frame scaffolding is set up by using two sections of the scaffold frame that are connected by two crossed sections of support poles that are organized in a square shape. New sections are assembled on top of the preceding sections. These sections are then used by workers to reach the desired height to carry out their work. Backdrop Kits - Pipe and Drape Social Distancing and DecorRugged pipe frame great for indoor and outdoor use; No tools needed. Set up in minutes. Includes carry bag. Multi-Purpose Projection Screen for Home Theatre, HD Cinema, Gaming, Presentations etc. Backdrop Kit to Projection Screen Conversion Kits; For Portable Backdrop Kit:Order one Crossbar, one Pair of Clamps, and one Screen

Basic Setting out in construction ( Surveying line , Lay

Aug 05, 2016 · Basic Setting out in construction ( Surveying line , Lay-out) Setting out is the process of locating points for columns, site boundary level, pile position and other necessary structural parts according to the construction drawing. Errors should be avoided because the whole structure will be build based on the respective setting out. DJ Lighting & Stage Lighting zZoundsAug 09, 2021 · ADJ UB 6H Stage Light. $189.99. 4 x. $47.50. FREE Delivery by Wednesday. Chauvet DJ Freedom H1 Wash Light Wireless Lighting System. $779.99. 8 x. $97.50. How To Build A 40 Antenna Mast:Guide for BeginnersDrill a 1-inch hole on the aluminum tube. Make sure the hole is drilled 2-feet away from the end of the tube. Grab the 10-inch fiberglass tube and drill 1-inch hole at 2-feet into both ends. Repeat the same procedure with the 5-inch fiberglass tube as well except drill hoke into only one end of the tube

How to Build a Deck - The Home Depot

Square the corners using the 3, 4 ,5 method. Measure 3 feet from where the lines intersect and make a mark on the string line. Measure 4 feet along the line that runs perpendicular to that line and make a mark. Measure between the 3-foot and 4-foot marks and adjust the line until the marks Shade Sail Installation Guide Tips on How to Plan for your Mar 11, 2020 · Lay a 4 inch (100mm) depth of 3/4 inch diameter gravel at the base of the post. Insert the posts using lag bolts partially driven into the post to hold it in place. Use string lines to ensure they are in plumb alignment. Temporarily brace the posts until the concrete has set. The proper classification of fixed assets AccountingToolsApr 14, 2021 · It is useful to set the capitalization limit higher than the cost of desktop and laptop computers, so that these items are not tracked as assets. Construction in progress . This account is a temporary one, and is intended to store the ongoing cost of constructing a building; once completed, shift the balance in this account to the Buildings

eTool :Scaffolding Occupational Safety and Health

Single-point Adjustable. Step Ladder Scaffold. Swing Stage. Trestle Ladder Scaffold. Tube and Coupler. Two-point Scaffold. Window Jack. This eTool * includes illustrated safety checklists for specific types of scaffolds. It identifies hazards, as well as the controls that :Yard Butler Hose Bib Extender Remote Spigot It basically consists of a 39" painted & capped square steel tube drilled and fitted with a short welded pipe nipple. The nipple is fitted with brass 3/4" female hose connector at one end and a brass hose shut-off faucet with a 3/4" male hose fitting at the other.